Skip to content
Power Plant

Industry application

Power Plant Fire Protection

Packaged pump systems with standby capability for critical energy infrastructure.

Equipment selection

Selection criteria

  1. Confirm design flow, pressure and water source
  2. Identify the specified electric, diesel or EDJ arrangement
  3. Confirm installation, controls and document requirements before quotation

Installation and project files

Provide the process-area context, pump-room drawing, utility availability, pipe direction and requested delivery documents. The proposed system must be reviewed against the approved project specification.