
Industry application
Power Plant Fire Protection
Packaged pump systems with standby capability for critical energy infrastructure.
Equipment selection
Selection criteria
- Confirm design flow, pressure and water source
- Identify the specified electric, diesel or EDJ arrangement
- Confirm installation, controls and document requirements before quotation
Installation and project files
Provide the process-area context, pump-room drawing, utility availability, pipe direction and requested delivery documents. The proposed system must be reviewed against the approved project specification.