Skip to content
Industrial Plant

Industry application

Industrial Plant Fire Protection

Configured fire pump packages for process plants, workshops and utility buildings.

Equipment selection

Selection criteria

  1. Confirm design flow, pressure and water source
  2. Identify the specified electric, diesel or EDJ arrangement
  3. Confirm installation, controls and document requirements before quotation

Installation and project files

Provide the process-area context, pump-room drawing, utility availability, pipe direction and requested delivery documents. The proposed system must be reviewed against the approved project specification.