Skip to content
Commercial Building

Industry application

Commercial Building Fire Protection

Compact and reliable pump system options for offices, hotels and mixed-use buildings.

Equipment selection

Selection criteria

  1. Confirm design flow, pressure and water source
  2. Identify the specified electric, diesel or EDJ arrangement
  3. Confirm installation, controls and document requirements before quotation

Installation and project files

Provide the process-area context, pump-room drawing, utility availability, pipe direction and requested delivery documents. The proposed system must be reviewed against the approved project specification.